todo

23

MW: Confirm Latero melange shade matches CAD

Check tonally darker melange per Bethany feedback

MW: Send full sample before meeting

She needs to review full sample before moving forward

PD Department - Hire another senior PD, graphics

2026-04-03

MW: Prep samples in available colors + lab dips

Send SMS in stock colors now, correct colors can follow

MWH

Police verification - Tapash

2026-04-03

Police verification follow up - Prameet

2026-04-03

Target 6.5 for tops

2026-04-03

PD Department - Absorb A

2026-04-03

Tomorrow: Work through sampling Excel tab by tab

Ensure all info is complete for team follow-ups

Friday: Fabric counter-sourcing meeting with Babu

Local market fabric being counter-sourced from mills. Check pricing, progress. Prepare for China trip.

MWH samples for China production

Samples needed by April 8th. Bangladesh closed Mar 19-29. Making in China - logistics TBD.

Shabbir: Deepali to advise Acid Wash sample date

Shabbir: Close Acid Wash costings (tomorrow)

Shabbir: Revise 88/12 costing to include print + Sudhakar review

Tell Sami how much you adore him

Change BD SIM to eSIM

This week

Order mithai for gift baskets

Iftar arrangement for Kabir (travel agent)

[Internal] Finalize Priyanka consultancy contract

Exit date Mar 15. Contract needs to be finalized before then. She keeps company SIM + corporate card.

2026-03-14

[WIWC] Send Caribbean Teal lab dips Mar 14

Lab dips ready - need Maria to confirm shipping address before sending out.

WIWC
2026-03-14

Trip to Portugal - should we go to London? Will samples be getting selected then? Should we be speaking with Karthik?

2026-04-03

PD Department - Speak w Ashesh + Gargi re: their requirements

2026-04-03

Book flexi London round trip tickets

in progress

2

AW26 CP - PRAIRIE Delay (Mountain Warehouse)

Bethany Adams escalating delay on PRAIRIE style in CHA fabric. ~1 month behind (was due Feb 28). Mill has revised FBL ready this week. Need Bethany approval Tuesday to meet handover. Risk: 5% CPR/week penalty + air freight if >3 weeks late.

2026-03-17

[WIWC] Source ALBA fabric alternate

SS21 TOP: Source similar fabric to 65/35 POLY/COTTON 145 GSM, 4.28 OZ/YD2, crease resist weave.

WIWC

blocked

0